Due to nationwide supply chain issues, the requirement of Customer Installation Standards manual, section 9.1.2.1, line 14: “All Underground Connected meter sockets and power panels shall be side-wired” will be relaxed for projects with a lead time less than 15 weeks or in the event of emergency replacement until December 31,2025. UL-rated meter bases that are designated by the manufacturer as designed for OH AND UG will temporarily be allowed for UG service.  All other requirements of section 9.1.2.1 will be required.  This temporary change will expire on December 31, 2025.  The availability of side-wired meter bases will be reviewed again in December.

Builder services and standards

Builders can use the form below to have electric service turned on for new residential construction:

Standards information:

To register to receive email notifications of future changes to this standard, click here.

Customer installation standards drawings

OVERHEAD

UNDERGROUND

Elevating a building or home

Service to permanent pole location (serves mobile homes and some buildings)

Meters

Residential/small non-residential

Commercial multiple meters (shopping centers, apartments, etc.)

Large industrial current instrument transformer rated meters

Miscellaneous

Questions or concerns? Call 1-800-ENTERGY (1-800-368-3749).

These are Adobe Acrobat files. If you can’t open them, please go to the Adobe site to get the Acrobat Reader.

Search Search
Download the free Entergy app on the App Store. Download the free Entergy app on Google Play.

myEntergy account

Additional links

Stay connected

© 2025 Entergy Corporation. All rights reserved.